With nothing to do on Monday except for some household chores and the project held up due to the wing covering and other small parts are stuck in the strike affected mail. :( I had a practice go at sorting the old tail assembly. I removed about 5mm of the sticky back covering on the surfaces by the joints in preparation for gluing. With the stab slightly wobbly now but still effectively glued, I held the fin to stab with clamps and a set square. Back filled the worse side of the joint with medium CA. I cut some quarter triangle balsa and made up some fillets. Covered them in Cub yellow Oracover. With the tail still clamped I glued these fillets plus two more for the underside with Medium CA. After a coffee I removed the clamps and we now have a stabiliser that is square to the fin. Hooray!
Attachments:
Last edit: 2 years 2 months ago by Phil Ford.
The following user(s) said Thank You: 4Pedalsfly, Brian

Please Log in or Create an account to join the conversation.

  • Phil Ford
  • Topic Author
  • Offline
  • Administrator
  • Administrator
More
2 years 2 months ago - 2 years 2 months ago #26143 by Phil Ford
Replied by Phil Ford on topic Nexa Twin Otter Rebuild
Tuesday and the post lady arrives with the covering from Macgregors but no 2mm rods, kavan hinges and Epoxy from RC World. Grrr. Earlier, whilst the wing is not covered I added some captured nuts where the wing stays attach to the wing rather than the maker's idea of a self tapper. Opening the covering rolls it appears that Cub Yellow is only one shade down from Cadmium Yellow. Still too bright for the Twotter. Um! What to do? Just get on with it and bite the bullet. Video phone rings! It's Matt wandering around a model shop. We compare the yellows. It may be that Golden Yellow is the nearest to the printed covering on the Twotter. Hope so cos' I have got Matt to bring two rolls back for me.

Meanwhile project can no further till wings are finished. Weather and wind speeds do not look too promising either for Cashmoor, Wednesday is a no go as RBH beckons, Thursday not sure and Friday we have got the grandsons all day and possible heavy rain is forecast at the weekend and onwards. I need some indoor jobs/projects.
Last edit: 2 years 2 months ago by Phil Ford.
The following user(s) said Thank You: MBorrett

Please Log in or Create an account to join the conversation.

  • Phil Ford
  • Topic Author
  • Offline
  • Administrator
  • Administrator
More
2 years 2 months ago - 2 years 2 months ago #26151 by Phil Ford
Replied by Phil Ford on topic Nexa Twin Otter Rebuild
With a big thanks to Matt who saw my recent post about colours and just so happened to be in Worthing at a well known model shop. Using video it was decided that Golden Yellow is the nearest. So, today, Wednesday I unwrapped the roll and it's so close and considering the model has been hanging around a bit so colour would have changed a little. The covering is Easycoat, not my favourite due to the fact that pigment is also the adhesive but at £10 a roll cheaper than Oracover it's got to be a bargain and a colour match. Oracover is three layers the pigment in the centre layer.

Wing are now covered and the aileron HV servos are installed. Ailerons are still waiting on hinges somewhere in the post. If they don't turn up tomorrow I will install the flap servos and repaint the wing tips if no household tasks appear- again.
Attachments:
Last edit: 2 years 2 months ago by Phil Ford.
The following user(s) said Thank You: 4Pedalsfly, kevinross, Brian, MBorrett

Please Log in or Create an account to join the conversation.

  • Phil Ford
  • Topic Author
  • Offline
  • Administrator
  • Administrator
More
2 years 2 months ago - 2 years 2 months ago #26153 by Phil Ford
Replied by Phil Ford on topic Nexa Twin Otter Rebuild
Not much achieved today due to lack of bits. However, I managed to preset the ailerons and flap servos and the flaps are set up using two channels. The latter due to the fact the servos are facing the same way so had to reverse one channel. I have created two versions on the Horus.

Version 1: uses Sbus and a 15 channel Hub. Two channels for Ailerons, two channels for Throttles, Two for Flaps (as per above) one channel for steering and two channel for switching beacons/lights. Spare channels for any more gadgetry. ;)

Version 2: Standard basic set up for 8 ch RX. Ail, Elv,Thr, Rud, Flap, Flap, Steer. Channel 8 is power in.
Last edit: 2 years 2 months ago by Phil Ford. Reason: Error
The following user(s) said Thank You: 4Pedalsfly, Brian

Please Log in or Create an account to join the conversation.

  • Phil Ford
  • Topic Author
  • Offline
  • Administrator
  • Administrator
More
2 years 2 months ago - 2 years 2 months ago #26175 by Phil Ford
Replied by Phil Ford on topic Nexa Twin Otter Rebuild
Monday decided on electronics version 1. Every surface and item has it's own channel via the Hub and Sbus. 12 in use at present and if I can make some landing lights that will be thirteen. Still no parts - courier has lost the package. :huh: No matter, I got some from somewhere else. Tail assembly arrived from the Nederlands on Tuesday so made some progress on the tail end on Wednesday. Stabiliser pushed through pre -cut slot in fin but was not square, out by 2 degs or so. So I nibbled a bit out of the slot and using a set square clamped to the stab and fin I zapped it with CA medium. Then slid the stabiliser supports on and zapped with CA. With that done I now dry fitted the assembly into the fuselage. When sat fully down the stab is level or should I say parallel with the fuselage line. I verifed this using a bubble level. However with the fuselage level crossways the stab was not level out again by around 2 degrees. Sand some balsa off the base of the fin to give a bit leeway and looser fit. Using a bit of skinning balsa on one side of the slot the fin is vertical and the stab is level. Re-checked three times, made up some 30 min epoxy and glued the assembly in along with the piece of 3/32 balsa. Coffe break for half an hour but keep checking the assembly.

After the break I glued the horns to the elevators and rudder. I had already dry fit checked they fitted okay into the fin and stabiliser. The rudder and elevator halves come with the Mylar hinges pre-glued into the control surfaces so it was just a matter of checking the alignment and securing with a few drops of Thin CA. Whilst things are now moving a better pace I connected the control rods to their respective surfaces using ball links. The rods seem to slide back n forth okay but I think the elevator guide tubes which are quite stiff compared to Sullivan snake tubes. Also I need to cut shorter at the exit end a bit more to allow for the up-n-down movement as the horn moves back n forth. This will reduce any rod to tube resistance - hopefully.

There is a slim chance that the ESC's will arrive tomorrow so if that is the case I can start working on the motive power side.
Attachments:
Last edit: 2 years 2 months ago by Phil Ford. Reason: Grammar again!
The following user(s) said Thank You: 4Pedalsfly, kevinross, Brian, MBorrett

Please Log in or Create an account to join the conversation.

  • Phil Ford
  • Topic Author
  • Offline
  • Administrator
  • Administrator
More
2 years 2 months ago - 2 years 2 months ago #26177 by Phil Ford
Replied by Phil Ford on topic Nexa Twin Otter Rebuild
No ESCs today but Friday if the update is to be believed. Anyway, done a bit of re-wiring and control surfaces are now set up. Quick assemble of the Otter to check again the controls. Placed a couple of ESCs temporarily on the motor mounts. Now the CG. 60mm back from leading edge. Using known weights and lipos it needs about 700gms. Checked on Motion RC forum and yes some Guys are using 2 x 3000 mah Graphene 3 cells. As I am using a 4 cell set up I had to have rummage in my lipo boxes. Found two 4000 maH 4 cell Gens Ace at 395 gms each. Along with the RX Life at 120 gms just behind the lipo packs it becomes just a tad nose heavy. So rumours were right, a roughly a kilo to balance. :blink: Final positioning I will do when the plane is fully assembled and ready to go. Maiden before Christmas?

Thinking back to my 10% larger H9 Twin Otter whose lipos are in the nacelles I had to have two life 2100 mah RX packs upfront along with 300 gms of lead in the nose too.

The red flare on the kitchen floor is the belly beacon not a fire. :lol:
Attachments:
Last edit: 2 years 2 months ago by Phil Ford.
The following user(s) said Thank You: 4Pedalsfly, Brian, MBorrett

Please Log in or Create an account to join the conversation.

Moderators: DaveBright
Time to create page: 0.315 seconds