1 year 5 months ago #26306 by DavidTappin
Replied by DavidTappin on topic Stearman build
You have created alignment with the bar through the middle, can’t you just bolt the two halves together, no separator required, or have I missed something?

Good to know you are back on the Stearman project, we have missed it. Gives me enthusiasm to get back on my Vampire project which has been neglected for so long that people (other than Simon Dean) have even given up asking me how it’s going!

Regards,
David

Please Log in or Create an account to join the conversation.

  • kevinross
  • Topic Author
  • Offline
  • Platinum Member
  • Platinum Member
More
1 year 5 months ago #26307 by kevinross
Replied by kevinross on topic Stearman build
This is my plan in brief but not going into detail how i plan to make the moulds or use them to lay up the actual cowl.

I'm currently at stage 1 in attached pic but i need to fill sand polish the shape to a high standard to form perfectly mating front and rear moulds - as pic 2

but in order to produce the two halves with accurate square edges at the mid point join i need to be able to have a separator ( in blue ) because when I apply filler to the two halves, there will be fillets ( in red ) adjacent to the separator plate . Then i will split the two halves and rejoin without the seperator plate and smooth away the fillets as per pic 4.

The separator plate needs to be semi rigid, very smooth finish on both sides and waxed to allow easy removal - some form of smooth plastic maybe ?
Attachments:
The following user(s) said Thank You: 4Pedalsfly, Brian

Please Log in or Create an account to join the conversation.

More
1 year 5 months ago #26308 by Brian
Replied by Brian on topic Stearman build
Hope you've still got all your fingers Kevin. 'Elf 'n Safety would have produced a multi-page manual to stop you doing that with a drill press.

Please Log in or Create an account to join the conversation.

  • kevinross
  • Topic Author
  • Offline
  • Platinum Member
  • Platinum Member
More
1 year 5 months ago - 1 year 5 months ago #26309 by kevinross
Replied by kevinross on topic Stearman build
Well Brian, the H&S police havn't paid me a visit yet - so all good so far !

Now on the 5th cycle of primer filler and cut back - a few more to go yet before the plug can be used to produce a good mould.
Attachments:
Last edit: 1 year 5 months ago by kevinross.
The following user(s) said Thank You: Phil Ford, Brian

Please Log in or Create an account to join the conversation.

More
1 year 5 months ago #26311 by ruggerbloke
Replied by ruggerbloke on topic Stearman build
Top quality work there Kevin. Well done.

Please Log in or Create an account to join the conversation.

  • kevinross
  • Topic Author
  • Offline
  • Platinum Member
  • Platinum Member
More
1 year 5 months ago #26312 by kevinross
Replied by kevinross on topic Stearman build
4 more cycles and nearly there - I discovered a high tech solution to separate the two halves during the process - its called sellotape !!
Attachments: