Well, today we have a fully assembled ARTF Curare. However, as with most projects of this ilk the fettling phase has come around. I'm going to take my time sorting out the r/h flap issue and trying to tidy up the servo cabling. Right now the cabling is a bit of a mess! So much wiring in such a small fuselage. Main thing as regards the airframe everything fits and lines up. Have to admit the canopy was an absolute pig to locate correctly. After much head scratching and sanding small areas of its structure it now fits reasonably well.
The Curare can now stand on its wheels.
No visit to Cashmore on the horizon so no hurry.